MPC Excellence

Munschek Your Partner for Dynamic Simulation

In factory and production planning, simulation is far more than just a technical tool – it is a critical success factor for making reliable and forward-looking decisions. 
With the help of digital models, complex processes can be realistically simulated and tested long before investments are made or changes are implemented. 

Simulation makes it possible to test planning ideas, identify risks, and uncover opportunities for optimization without disrupting ongoing operations.  
 

Greater Efficiency, Cost-Effectiveness, and Planning Certainty

We develop realistic simulation models that accurately replicate complex production processes and enable in-depth analyses. With our holistic approach, we identify bottlenecks, optimize processes, and support well-informed and sustainable investment decisions. In this way, we create transparency, minimize risks, and increase planning certainty.

data.header

Integrated Planning Approach

Simulation as an integral part of all stages, right through to implementation.

data.header

Consistent Data Base

All planning and simulation data is consolidated into a single, unified data source – this reduces the number of interfaces and improves data quality.

data.header

Highly Practical

Our models are developed based on real process data and empirical findings. The result: concrete recommendations for action instead of theoretical analyses.

data.header

Reduced Project Risks

Identifying bottlenecks and vulnerabilities minimizes planning and investment risks.

data.header

Digital Twin

Results-oriented simulation as the foundation
for future optimizations.

Our Services

Greater transparency, less risk through – dynamic simulation

  • Design and simulation of transport systems, conveyor lines, automated guided vehicles (AGVs), and route trains
  • Personnel flow planning and personnel airlock simulation in cleanrooms
  • Analysis and optimization of logistics metrics such as inventory levels, dwell times, and frequencies
  • Assessment of equipment utilization for maximum efficiency
  • Bottleneck analyses for early identification of critical process steps and infrastructure, as well as targeted relief measures

Your Benefits

Simulation – an integral part of your holistic planning

  • Identify risks early
    Uncover bottlenecks, wait times, and inefficient processes as early as the planning phase.

  • Make well-informed, data-driven decisions
    Scenarios are tested under realistic conditions – investments and measures can be based on reliable results.

  • Understand and optimize processes 
    Simulation brings transparency to complex material and information flows and highlights opportunities for improvement. 

  • Save time and money 
    Errors in planning and implementation are avoided – projects are completed faster, more reliably, and more cost-effectively. 

  • Ensure future-proofing 
    With a digital model as a foundation, future changes and expansions can be flexibly evaluated and simulated 

Symbol einer Fabrik, die auf einem Fabriklayout steht, was die Verbindung zwischen Umgebung und Prozessablauf darstellt

Factory planning

We design your factory as an economic value chain.

LEARN MORE
Symbol eines aufsteigenden Balkendiagramms mit einem Pfeil nach oben, das Fortschritt darstellt

Process design

We plan your lean production.

LEARN MORE
Symbol mehrerer ineinander verschachtelter Rohrleitungen, die eine vernetzte industrielle Infrastruktur darstellen

Industrial engineering

We safeguard your production.

LEARN MORE
Symbol eines Routenzuges mit einem Tracking Symbol, was eine Lokalisierung darstellt

Logistics

We develop a systematic approach to your materials and information logistics.

LEARN MORE
Symbol eines Porträts einer Person.

Project management

We manage and implement your project.

LEARN MORE
Symbol zweier Tropfen in verschiedenen Größen.

Cleanroom

We design and build cleanrooms within the overall context of a factory.

LEARN MORE

Your contact

Felix Waffenschmidt

Senior Project Engineer

f.waffenschmidtnoSpam@munscheknoSpam.com

+49 151 111 23 087

Benjamin Stausberg

Senior Project Engineer

b.stausbergnoSpam@munscheknoSpam.com

+49 151 578 529 60